GPT sprint document map
Start with the minimum viable project pack, then create and refresh the right documents as evidence moves through each four-week sprint.
What must exist before mobilisation can begin?
Seven concise records are enough to start safely. They can be incomplete, but each needs an owner and an authoritative source.
When each core document is created
Required documents establish the gate. Living documents refresh every sprint. Exit evidence unlocks the next stage.
Generate early. Improve with evidence.
Asset library
Explore a synthetic catalogue shaped by the aggregate analysis, with lifecycle, automation and operating context.
| Asset | Scenario | Lifecycle family | Type | Priority | Automation | Status |
|---|---|---|---|---|---|---|
Four-week sprint factory
Create every required asset shell early, then replace assumptions with evidence as the sprint progresses.
Day-one asset factory
First 15 controls
Shared fact and synergy map
Documents become coordinated when they depend on the same governed facts rather than copying prose between files.
What happens when a fact changes?
Automated project workflows
Six reusable workflows connect commercial activation, discovery, engineering, assurance, reporting and operation.
15 missing assets
The most material additions required to make the project approach genuinely traceable, governable and self-updating.
Precedent intelligence
Move beyond “reusable = yes” by distinguishing exemplars, templates, patterns, methods, evidence and live operating assets.
Precedent fit score
From client asset to reusable IP
- Detect a successful approved asset
- Remove or parameterise client material
- Record context and limitations
- Assign quality, owner and expiry
- Test on a synthetic scenario
- Approve and monitor future outcomes
Automation control
Monitor project events, regeneration jobs, approval gates and publication controls.
Asset refresh runs
Automation policy
Demo configuration
Data sources and integration status
The demo uses a publication-safe synthetic catalogue. These are the systems required to make project assets live and self-updating.
Integration status
Refresh schedules
Production controls
Project operations assistant
Ask questions across the reconciled register and the proposed operating model.